Overhauling Contract for GTG-1, 2 and 3 during 12th C Inspection at NTPC – ANTA (Rajasthan). in the year of 2014 - 15.

Minor Overhauling of 135 MW Alstom make Gas Turbine Generator #1 at NTPC Ltd. Jhanor ( Gujarat-India). in the year of 2014.

Minor Overhauling of 135 MW Alstom make Gas Turbine Generator #3 at NTPC Ltd. Jhanor in the Year of Sepetember 2013. (Gujarat-India)

Overhauling Contract for 6th “C” Inspection of 135 MW Alstom make Gas Turbine #1 at NTPC Ltd. Jhanor in the Year of February 2013. (Gujarat-India)

Hiring of Indian manpower for Major overhauling of 135 MW Alstom make generator # 1 & its Auxiliaries at NTPC Ltd. Jhanor in the Year of February 2013. (Gujarat-India)

Overhauling of 88 MW Alastom make Gas Turbine – 1 and 3 Generators in 11th C Inspection at NTPC Limited.- Baran, Anta (Rajasthan) in the year of December 2012.

Work of “C” Inspection (major Over Hauling of Alstom Make 230 MW Gas Turbine – CCPP # II at GSECL Utran (Gujarat) in the year of June 2012 (India).

Hiring of Indian manpower for Major overhauling of 135 MW Alstom make generator # 2 & its Auxiliaries at NTPC Ltd. Jhanor in the Year of October, 2011. (Gujarat-India)

Overhauling Contract for 6th “C” Inspection of 135 MW Alstom make Gas Turbine # 2 at NTPC Ltd. Jhanor in the Year of October, 2011. (Gujarat-India)

Indian Manpower Contract for “C” Inspection of 135 MW Alstom make Gas Turbine Generator # 3 at NTPC Ltd. Jhanor (Gujarat) in the Year of January, 2011.

Replacement of damaged Vanes of Row # 1 of 135 MW Alstom make GT # 2 at NTPC Ltd. Jhanor (Gujarat) in the Year of November, 2010.

Supply of skilled craft labour for hot gas path inspection of 68.59 MW GE make Frame-VI FA (Marke V) Gas Turbine of CCPP Unit 1 at GSECL Dhuvaran TPS(Gujarat) in the year of April, 2010.

Alignment Of Reduction Gear Box Vs Generator Of Gas Turbine Unit # 1, 2, 3 & 4 at GMR-KAKINADA In The Year of April, 2010.

Major Overhauling of 135 MW ABB Make Gas Turbine Generator # 1 at NTPC Ltd.-Jhanor (Gujarat)in the year of March, 2010.

Indian Manpower Contract for “C” Inspection of 135 MW ABB make GT # 1 at NTPC Ltd.-Jhanor.(Gujarat) in the year of March, 2010.

Overhauling of 4 nos IHI make gear box of 51 MW Gas Turbine at GMR-MANGALORE in the year of January, 2010

Replacement of Vane Row # 1 in 135 MW ABB Make GT # 3 at NTPC Ltd. –Jhanor in the year of September 2009.

Maintenance work of 135MW ABB make Gas Turbine #3 at NTPC Ltd. – Jhanor (Gujarat) in the year of October 2006.

Major Overhauling of GE make 22MW (Frame –V) Gas Turbines No-2 at OSWAL CHEMICALS & FERTILIZERS LTD.- Shahjahanpur (U.P) in the year of June- 2005.

Major Overhauling of GE make 32MW(Frame –VI) Gas Turbine at Reliance –Hazira in the year of May - 2005.10

Major Overhauling of 88 MW ABB makes Gas Turbine of unit number –3 at NTPC- Anta (Rajasthan) in the year of December 2004.

Major Overhauling of 88 MW ABB makes Gas Turbine of unit number – 1 at NTPC- Anta (Rajasthan) in the year of October 2004.

Major Overhauling of 88 MW ABB makes Gas Turbine of unit number –2 at NTPC-Anta (Rajasthan) in the year of July 2004.

Replacement of KHI 2x1.5 MW GT Gearbox & Turbine at Godrej Industries Ltd. (GIL) at Vikroli Mumbai (Maharashtra) contract through L&T O&M Power In the Year of June 2004 (Contract through Larsen & Toubro O & M Power – Vadodara).

Combustion inspection of 30 MW – (Frame -VI) GTs & Revisioning of Fuel Nozzles Unit No. 2 at Gujarat Refineries of Indian Oil Corp. Ltd – Baroda in the year of March-2004.

Hiring of precision tools tackles, installation & alignment checking Services for 1.5 MW KHI make Generator at Godrej Mumbai in the year of Dec – 03 & Oct – 03 (Contract through Larsen & Toubro O & M Power – Vadodara) ( Two Times).

Combustion inspection of 30 MW – (Frame -VI) GTs & Revisioning of Fuel Nozzles Unit No. 2 at Gujarat Refineries of Indian Oil Corp. Ltd – Baroda in the year of 2002.

Combustion inspection of 30 MW – (Frame -VI) GTs & Revisioning of Fuel Nozzles Unit No. 3 at Gujarat Refineries of Indian Oil Corp. Ltd - Baroda in the year of 2002.

Combustion inspection of 30 MW – (Frame -VI) GTs & Revisioning of Fuel Nozzles Unit No. 1 at Gujarat Refineries of Indian Oil Corp. Ltd – Baroda in the year of 2002.

Replacement of KHI 2x1.5 MW Gearbox & Turbine at Godrej Industries Ltd. (GIL) at Valia Dist: Bharuch in the year of 2002 (Contract through Larsen & Toubro O & M Power – Vadodara).

Capital over hauling of Fiat make (Italian) 27 MW Gas Turbine Generator Set at T. P. S. Dhuvaran of Gujarat Electricity Board in the year of 2001.

Capital over hauling of Fiat make (Italian) 27 MW Gas Turbine Generator Set at T. P. S. Dhuvaran of Gujarat Electricity Board in the year of 1999.

Complete job of Dismantling 36 MW (Frame-VI) G.T. Unit No. 2 for Combustion inspection at Gas Based Power Station Utran of Gujarat Electricity Board in the Year of 1998.

Complete Job of Dismantling 36 MW (Frame-VI) G.T. Unit No.1 Combustion inspection at Gas Based Power station Utran of Gujarat Electricity Board in the Year of 1997.